# Roadmap This is the implementation road map for the project. It outlines the key milestones and features in incremental steps, allowing for a structured approach to development and deployment. ## Phase 1: Conceptualization and Planning This phase will be achieved through discussion and research and will include the following steps (no code should be implemented in this phase): ### 1.1 Requirements Analysis - Define the scope and requirements of the project - Identify constraints and non-functional requirements - Determine host environment (cloud provider, VPS, or local) ### 1.2 Technology Selection ✅ **Decisions documented in [ADR.md](ADR.md)** - **Cloud**: AWS - **Infrastructure as Code**: Terraform - **Configuration Management**: Ansible (kept minimal) - **Application Deployment**: Docker + Docker Compose - **Database**: PostgreSQL (self-hosted in Docker) - **Reverse Proxy**: Nginx - **SSL**: Let's Encrypt with certbot - **Update Automation**: Watchtower - **Monitoring**: Prometheus + Grafana (later phase) - **Logging**: Loki + Promtail (later phase) - **Backup**: Custom scripts + S3 (later phase) ### 1.3 Architecture Design ✅ - ✅ Overall system architecture designed - ✅ Network topology planned (VPC, subnets, security groups) - ✅ Three architecture diagrams created in docs/diagrams/ ### 1.4 Project Structure ✅ - Directory structure planned (will create incrementally per phase) - Documentation structure in place (`docs/diagrams/`) - Naming conventions: lowercase, hyphens for files, descriptive names ### Goals: - ✅ A clear full Roadmap for the project available in this file - ✅ Technology stack documented with rationale (see ADR.md) - ✅ Architecture diagrams created (3 diagrams in docs/diagrams/) - ✅ Project structure planned **Phase 1 Complete!** Ready to begin Phase 2 (Infrastructure Setup). --- ## Phase 2: Infrastructure Setup This phase focuses on preparing the hosting environment and basic infrastructure components. ### 2.1 AWS Account Setup - Configure AWS CLI and credentials - Set up Terraform backend (S3 + DynamoDB for state locking) - Create Route 53 hosted zone for domain - Set up budget alerts and cost monitoring ### 2.2 Terraform Infrastructure Foundation - Create VPC with public/private subnets - Set up Internet Gateway and NAT Gateway (if needed) - Configure Security Groups (EC2, RDS, ALB rules) - Provision EC2 instance with appropriate IAM role - Set up RDS PostgreSQL instance - Configure Route 53 DNS records - Install Docker and Docker Compose on EC2 (user data script) ### 2.3 Security Hardening - Configure SSH key-based authentication only - Set up bastion host or Systems Manager Session Manager - Enable VPC Flow Logs - Configure CloudTrail for audit logging - Apply least-privilege IAM policies ### Goals: - AWS infrastructure provisioned via Terraform - EC2 instance running and accessible - RDS PostgreSQL ready - Domain DNS configured - Security hardening complete - Infrastructure can be destroyed and recreated from code --- ## Phase 3: Automated Gitea Deployment This phase implements the automated, reproducible Gitea installation. ### 3.1 Database Setup - Automate database installation (PostgreSQL/MariaDB/MySQL) - Create Gitea database and user - Configure database for production use - Secure database access ### 3.2 Gitea Installation - Create automation scripts/playbooks for Gitea installation - Configure Gitea application settings - Set up file storage and data directories - Configure Gitea to use database ### 3.3 Reverse Proxy Configuration - Install and configure reverse proxy (nginx/Apache) - Generate/configure SSL certificates - Configure proxy to forward to Gitea - Ensure Gitea UI is only accessible via proxy - Set up HTTP to HTTPS redirect ### 3.4 Testing - Test Gitea accessibility via HTTPS - Verify direct access to Gitea is blocked - Test Gitea functionality (create user, repo, etc.) - Validate automation by destroying and recreating environment ### Goals: - Gitea running and accessible via HTTPS through reverse proxy - Installation fully automated and reproducible - Documentation of deployment process --- ## Phase 4: Update Automation This phase implements automated update mechanisms for Gitea and related components. ### 4.1 Update Strategy Design - Define update schedule (when to check/apply updates) - Define rollback strategy - Plan pre-update backup automation ### 4.2 Update Automation Implementation - Implement automated update mechanism - Configure pre-update health checks - Configure post-update validation - Set up update notifications - Test update process ### Goals: - Automated update system operational - Update process tested and validated - Rollback procedure documented --- ## Phase 5: Backup Strategy Implementation This phase implements comprehensive backup solutions. ### 5.1 Backup Concept Document - Document backup strategy (3-2-1 rule) - Define backup scope (database, repos, config, etc.) - Define retention policy - Define RTO and RPO targets ### 5.2 Backup Implementation - Automate database backups - Automate Gitea data directory backups - Automate configuration backups - Set up backup storage (local + remote) - Implement backup rotation and cleanup - Schedule automated backups ### 5.3 Recovery Testing - Document restore procedures - Test database restore - Test full system restore - Document recovery time ### Goals: - Automated backup system operational - Restore procedures tested and documented - Backup strategy document completed --- ## Phase 6: Monitoring Implementation This phase implements monitoring for system health and performance. ### 6.1 Monitoring Concept Document - Define key metrics to monitor - Define alerting thresholds - Define alert channels (email, Slack, etc.) ### 6.2 Monitoring Setup - Deploy monitoring solution - Configure system metrics collection (CPU, RAM, disk, network) - Configure Gitea-specific metrics - Configure database metrics - Set up monitoring dashboards - Configure alerting rules ### 6.3 Testing - Simulate failure scenarios - Verify alerts trigger correctly - Validate dashboard accuracy ### Goals: - Monitoring system operational with dashboards - Alerting configured and tested - Monitoring concept document completed --- ## Phase 7: Logging Implementation This phase implements centralized logging for all components. ### 7.1 Logging Concept Document - Define logging architecture - Define log retention policy - Define log analysis requirements ### 7.2 Logging Setup - Deploy centralized logging solution - Configure Gitea application logging - Configure reverse proxy access logs - Configure database logs - Configure system logs collection - Set up log parsing and indexing - Create log search and visualization dashboards ### 7.3 Testing - Verify logs are being collected - Test log search functionality - Test log-based alerts (if applicable) ### Goals: - Centralized logging operational - All components sending logs to central system - Logging concept document completed --- ## Phase 8: Redundancy and High Availability This phase implements fail-safe operations and redundancy. ### 8.1 Redundancy Concept Document - Document SPOF (Single Points of Failure) analysis - Design HA architecture - Define failover strategy - Define acceptable downtime ### 8.2 Redundancy Implementation (Optional/Simplified) - Implement database redundancy (replication/clustering) OR document approach - Implement application redundancy (multiple Gitea instances) OR document approach - Implement load balancing OR document approach - Document manual failover procedures ### Goals: - Redundancy concept document completed - PoC or detailed plan for HA implementation - Failover procedures documented --- ## Phase 9: Documentation and Final Testing This phase consolidates all documentation and performs end-to-end testing. ### 9.1 Documentation - Create comprehensive README - Document architecture with diagrams - Document all procedures (deployment, updates, backup/restore, failover) - Create runbooks for common scenarios - Document interview discussion points ### 9.2 Final Testing - Perform end-to-end deployment test - Test all automated processes - Verify all documentation is accurate - Test system under load (optional) ### 9.3 Repository Organization - Store all code and docs in Gitea repository - Ensure repository is well-organized - Add proper README and documentation ### Goals: - Complete documentation package - All automation tested and validated - Ready for interview presentation --- ## Phase 10: Interview Preparation This phase prepares for the interview discussion. ### 10.1 Preparation - Review all concept documents - Prepare to explain technology choices - Prepare architecture diagrams for presentation - Prepare to demonstrate the system - List lessons learned and trade-offs made - Prepare improvement suggestions ### Goals: - Ready to discuss all aspects of the implementation - Demo environment functional and accessible - Confident in technology choices and concepts --- ## Success Criteria - ✅ Gitea accessible via HTTPS through reverse proxy - ✅ Installation fully automated and reproducible - ✅ Automated updates configured and tested - ✅ Comprehensive concept documents for: Backup, Monitoring, Logging, Redundancy - ✅ At least one PoC implementation (optional but recommended) - ✅ All code and documentation in Git repository - ✅ System accessible to interviewer over internet