# Roadmap
|
|
|
|
This is the implementation road map for the project. It outlines the key milestones and features in incremental steps, allowing for a structured approach to development and deployment.
|
|
|
|
## Phase 1: Conceptualization and Planning
|
|
|
|
This phase will be achieved through discussion and research and will include the following steps (no code should be implemented in this phase):
|
|
|
|
### 1.1 Requirements Analysis
|
|
- Define the scope and requirements of the project
|
|
- Identify constraints and non-functional requirements
|
|
- Determine host environment (cloud provider, VPS, or local)
|
|
|
|
### 1.2 Technology Selection ✅
|
|
**Decisions documented in [ADR.md](ADR.md)**
|
|
|
|
- **Cloud**: AWS
|
|
- **Infrastructure as Code**: Terraform
|
|
- **Configuration Management**: Ansible (kept minimal)
|
|
- **Application Deployment**: Docker + Docker Compose
|
|
- **Database**: PostgreSQL (self-hosted in Docker)
|
|
- **Reverse Proxy**: Nginx
|
|
- **SSL**: Let's Encrypt with certbot
|
|
- **Update Automation**: Watchtower
|
|
- **Monitoring**: Prometheus + Grafana (later phase)
|
|
- **Logging**: Loki + Promtail (later phase)
|
|
- **Backup**: Custom scripts + S3 (later phase)
|
|
|
|
### 1.3 Architecture Design ✅
|
|
- ✅ Overall system architecture designed
|
|
- ✅ Network topology planned (VPC, subnets, security groups)
|
|
- ✅ Three architecture diagrams created in docs/diagrams/
|
|
|
|
### 1.4 Project Structure ✅
|
|
- Directory structure planned (will create incrementally per phase)
|
|
- Documentation structure in place (`docs/diagrams/`)
|
|
- Naming conventions: lowercase, hyphens for files, descriptive names
|
|
|
|
### Goals:
|
|
- ✅ A clear full Roadmap for the project available in this file
|
|
- ✅ Technology stack documented with rationale (see ADR.md)
|
|
- ✅ Architecture diagrams created (3 diagrams in docs/diagrams/)
|
|
- ✅ Project structure planned
|
|
|
|
**Phase 1 Complete!** Ready to begin Phase 2 (Infrastructure Setup).
|
|
|
|
---
|
|
|
|
## Phase 2: Infrastructure Setup
|
|
|
|
This phase provisions the AWS infrastructure using Terraform.
|
|
|
|
### 2.1 Terraform Backend Setup ✅
|
|
- Configure AWS CLI and credentials locally
|
|
- Set up Terraform backend (S3 bucket for state storage)
|
|
- Initialize Terraform working directory
|
|
|
|
### 2.2 Core Infrastructure ✅
|
|
- ✅ Create VPC with single public subnet
|
|
- ✅ Set up Internet Gateway
|
|
- ✅ Configure Security Group for EC2 (ports 22, 80, 443)
|
|
- ✅ Provision EC2 instance (t3.medium, Ubuntu 24.04) with IAM role
|
|
- ✅ Create S3 bucket for backups (with versioning & encryption)
|
|
- ✅ Configure Route 53 DNS records (A record: gitea.poll-streams.com → EC2)
|
|
- ✅ Use official Terraform AWS modules (VPC, Security Group)
|
|
- ✅ Refactored into separate files: main.tf, vpc.tf, security.tf, compute.tf, storage.tf, iam.tf, dns.tf, outputs.tf
|
|
|
|
### 2.3 Security Configuration ✅
|
|
- ✅ Configure SSH key-based authentication (Ed25519, generated via Terraform)
|
|
- ✅ SSH access from anywhere (0.0.0.0/0) - security via key-based auth
|
|
- ✅ Apply IAM policies (AmazonS3FullAccess for EC2 backups)
|
|
- ✅ Security group follows least access (only 22, 80, 443 inbound; all outbound)
|
|
- ✅ Encrypted EBS root volume (30GB gp3)
|
|
|
|
### Goals: ✅
|
|
- ✅ AWS infrastructure fully defined in Terraform code
|
|
- ✅ EC2 instance provisioned and accessible via SSH
|
|
- ✅ S3 backup bucket created
|
|
- ✅ Domain DNS configured and resolving
|
|
- ✅ Infrastructure can be destroyed and recreated with `terraform apply`
|
|
|
|
**Phase 2 Complete!** Ready to begin Phase 3 (Automated Gitea Deployment).
|
|
|
|
---
|
|
|
|
## Phase 3: Automated Gitea Deployment
|
|
|
|
This phase implements the automated, reproducible Gitea installation.
|
|
|
|
### 3.1 Database Setup ✅
|
|
- ✅ PostgreSQL 18.4 deployed via Docker Compose
|
|
- ✅ Database credentials stored in AWS Secrets Manager
|
|
- ✅ Random password generation via Terraform
|
|
- ✅ Volume mounted at /var/lib/postgresql (PostgreSQL 18+ requirement)
|
|
- ✅ Health checks configured with pg_isready
|
|
|
|
### 3.2 Gitea Installation ✅
|
|
- ✅ Gitea 1.22.6 deployed via Docker Compose
|
|
- ✅ Ansible playbooks created: setup-system.yml, deploy-gitea.yml, setup-ssl.yml, site.yml
|
|
- ✅ Docker + AWS CLI installation automated
|
|
- ✅ Gitea configured with environment variables (database, domain, ROOT_URL)
|
|
- ✅ SSH git access on port 2222
|
|
- ✅ Volumes for persistent data
|
|
|
|
### 3.3 Reverse Proxy Configuration ✅
|
|
- ✅ Nginx 1.27-alpine deployed via Docker Compose
|
|
- ✅ Let's Encrypt SSL certificate obtained via certbot
|
|
- ✅ Two-stage nginx config (HTTP-only for ACME, then HTTPS)
|
|
- ✅ SSL termination at nginx, proxy to Gitea on port 3000
|
|
- ✅ HTTP to HTTPS redirect configured
|
|
- ✅ Security headers (HSTS, X-Frame-Options, etc.)
|
|
- ✅ WebSocket support for real-time features
|
|
- ✅ 512MB upload limit
|
|
|
|
### 3.4 Testing ✅
|
|
- ✅ HTTPS access verified: https://gitea.poll-streams.com
|
|
- ✅ Valid SSL certificate (Let's Encrypt)
|
|
- ✅ HTTP → HTTPS redirect working
|
|
- ✅ Gitea web interface accessible and functional
|
|
- ✅ User account created, repository created
|
|
- ✅ Git push via HTTPS tested successfully
|
|
- ✅ Full deployment reproducible via `ansible-playbook site.yml`
|
|
|
|
### Goals: ✅
|
|
- ✅ Gitea running and accessible via HTTPS through reverse proxy
|
|
- ✅ Installation fully automated and reproducible
|
|
- ✅ Production-grade deployment with SSL
|
|
|
|
**Phase 3 Complete!** Gitea is fully deployed, secured with SSL, and accessible from the internet.
|
|
|
|
---
|
|
|
|
## Phase 4: Update Automation
|
|
|
|
This phase implements automated update mechanisms for Gitea and related components.
|
|
|
|
### 4.1 Update Strategy Design
|
|
- Define update schedule (when to check/apply updates)
|
|
- Define rollback strategy
|
|
- Plan pre-update backup automation
|
|
|
|
### 4.2 Update Automation Implementation
|
|
- Implement automated update mechanism
|
|
- Configure pre-update health checks
|
|
- Configure post-update validation
|
|
- Set up update notifications
|
|
- Test update process
|
|
|
|
### Goals:
|
|
- Automated update system operational
|
|
- Update process tested and validated
|
|
- Rollback procedure documented
|
|
|
|
---
|
|
|
|
## Phase 5: Backup Strategy Implementation
|
|
|
|
This phase implements comprehensive backup solutions.
|
|
|
|
### 5.1 Backup Concept Document
|
|
- Document backup strategy (3-2-1 rule)
|
|
- Define backup scope (database, repos, config, etc.)
|
|
- Define retention policy
|
|
- Define RTO and RPO targets
|
|
|
|
### 5.2 Backup Implementation
|
|
- Automate database backups
|
|
- Automate Gitea data directory backups
|
|
- Automate configuration backups
|
|
- Set up backup storage (local + remote)
|
|
- Implement backup rotation and cleanup
|
|
- Schedule automated backups
|
|
|
|
### 5.3 Recovery Testing
|
|
- Document restore procedures
|
|
- Test database restore
|
|
- Test full system restore
|
|
- Document recovery time
|
|
|
|
### Goals:
|
|
- Automated backup system operational
|
|
- Restore procedures tested and documented
|
|
- Backup strategy document completed
|
|
|
|
---
|
|
|
|
## Phase 6: Monitoring Implementation
|
|
|
|
This phase implements monitoring for system health and performance.
|
|
|
|
### 6.1 Monitoring Concept Document
|
|
- Define key metrics to monitor
|
|
- Define alerting thresholds
|
|
- Define alert channels (email, Slack, etc.)
|
|
|
|
### 6.2 Monitoring Setup
|
|
- Deploy monitoring solution
|
|
- Configure system metrics collection (CPU, RAM, disk, network)
|
|
- Configure Gitea-specific metrics
|
|
- Configure database metrics
|
|
- Set up monitoring dashboards
|
|
- Configure alerting rules
|
|
|
|
### 6.3 Testing
|
|
- Simulate failure scenarios
|
|
- Verify alerts trigger correctly
|
|
- Validate dashboard accuracy
|
|
|
|
### Goals:
|
|
- Monitoring system operational with dashboards
|
|
- Alerting configured and tested
|
|
- Monitoring concept document completed
|
|
|
|
---
|
|
|
|
## Phase 7: Logging Implementation
|
|
|
|
This phase implements centralized logging for all components.
|
|
|
|
### 7.1 Logging Concept Document
|
|
- Define logging architecture
|
|
- Define log retention policy
|
|
- Define log analysis requirements
|
|
|
|
### 7.2 Logging Setup
|
|
- Deploy centralized logging solution
|
|
- Configure Gitea application logging
|
|
- Configure reverse proxy access logs
|
|
- Configure database logs
|
|
- Configure system logs collection
|
|
- Set up log parsing and indexing
|
|
- Create log search and visualization dashboards
|
|
|
|
### 7.3 Testing
|
|
- Verify logs are being collected
|
|
- Test log search functionality
|
|
- Test log-based alerts (if applicable)
|
|
|
|
### Goals:
|
|
- Centralized logging operational
|
|
- All components sending logs to central system
|
|
- Logging concept document completed
|
|
|
|
---
|
|
|
|
## Phase 8: Redundancy and High Availability
|
|
|
|
This phase implements fail-safe operations and redundancy.
|
|
|
|
### 8.1 Redundancy Concept Document
|
|
- Document SPOF (Single Points of Failure) analysis
|
|
- Design HA architecture
|
|
- Define failover strategy
|
|
- Define acceptable downtime
|
|
|
|
### 8.2 Redundancy Implementation (Optional/Simplified)
|
|
- Implement database redundancy (replication/clustering) OR document approach
|
|
- Implement application redundancy (multiple Gitea instances) OR document approach
|
|
- Implement load balancing OR document approach
|
|
- Document manual failover procedures
|
|
|
|
### Goals:
|
|
- Redundancy concept document completed
|
|
- PoC or detailed plan for HA implementation
|
|
- Failover procedures documented
|
|
|
|
---
|
|
|
|
## Phase 9: Documentation and Final Testing
|
|
|
|
This phase consolidates all documentation and performs end-to-end testing.
|
|
|
|
### 9.1 Documentation
|
|
- Create comprehensive README
|
|
- Document architecture with diagrams
|
|
- Document all procedures (deployment, updates, backup/restore, failover)
|
|
- Create runbooks for common scenarios
|
|
- Document interview discussion points
|
|
|
|
### 9.2 Final Testing
|
|
- Perform end-to-end deployment test
|
|
- Test all automated processes
|
|
- Verify all documentation is accurate
|
|
- Test system under load (optional)
|
|
|
|
### 9.3 Repository Organization
|
|
- Store all code and docs in Gitea repository
|
|
- Ensure repository is well-organized
|
|
- Add proper README and documentation
|
|
|
|
### Goals:
|
|
- Complete documentation package
|
|
- All automation tested and validated
|
|
- Ready for interview presentation
|
|
|
|
---
|
|
|
|
## Phase 10: Interview Preparation
|
|
|
|
This phase prepares for the interview discussion.
|
|
|
|
### 10.1 Preparation
|
|
- Review all concept documents
|
|
- Prepare to explain technology choices
|
|
- Prepare architecture diagrams for presentation
|
|
- Prepare to demonstrate the system
|
|
- List lessons learned and trade-offs made
|
|
- Prepare improvement suggestions
|
|
|
|
### Goals:
|
|
- Ready to discuss all aspects of the implementation
|
|
- Demo environment functional and accessible
|
|
- Confident in technology choices and concepts
|
|
|
|
---
|
|
|
|
## Success Criteria
|
|
|
|
- ✅ Gitea accessible via HTTPS through reverse proxy
|
|
- ✅ Installation fully automated and reproducible
|
|
- ✅ Automated updates configured and tested
|
|
- ✅ Comprehensive concept documents for: Backup, Monitoring, Logging, Redundancy
|
|
- ✅ At least one PoC implementation (optional but recommended)
|
|
- ✅ All code and documentation in Git repository
|
|
- ✅ System accessible to interviewer over internet |