- Add ADR.md documenting all technology stack decisions with rationale - Create comprehensive ROADMAP.md with 10-phase implementation plan - Add 3 architecture diagrams (AWS infrastructure, application stack, network) - Document collaboration guidelines in `.github/copilot-instructions.md` - Technology stack descisions: AWS, Terraform, Ansible, Docker Compose, PostgreSQL Phase 1 establishes foundation for automated Gitea deployment with proper decision tracking and incremental development approach.
9.3 KiB
Roadmap
This is the implementation road map for the project. It outlines the key milestones and features in incremental steps, allowing for a structured approach to development and deployment.
Phase 1: Conceptualization and Planning
This phase will be achieved through discussion and research and will include the following steps (no code should be implemented in this phase):
1.1 Requirements Analysis
- Define the scope and requirements of the project
- Identify constraints and non-functional requirements
- Determine host environment (cloud provider, VPS, or local)
1.2 Technology Selection ✅
Decisions documented in ADR.md
- Cloud: AWS
- Infrastructure as Code: Terraform
- Configuration Management: Ansible (kept minimal)
- Application Deployment: Docker + Docker Compose
- Database: PostgreSQL (self-hosted in Docker)
- Reverse Proxy: Nginx
- SSL: Let's Encrypt with certbot
- Update Automation: Watchtower
- Monitoring: Prometheus + Grafana (later phase)
- Logging: Loki + Promtail (later phase)
- Backup: Custom scripts + S3 (later phase)
1.3 Architecture Design ✅
- ✅ Overall system architecture designed
- ✅ Network topology planned (VPC, subnets, security groups)
- ✅ Three architecture diagrams created in docs/diagrams/
1.4 Project Structure ✅
- Directory structure planned (will create incrementally per phase)
- Documentation structure in place (
docs/diagrams/) - Naming conventions: lowercase, hyphens for files, descriptive names
Goals:
- ✅ A clear full Roadmap for the project available in this file
- ✅ Technology stack documented with rationale (see ADR.md)
- ✅ Architecture diagrams created (3 diagrams in docs/diagrams/)
- ✅ Project structure planned
Phase 1 Complete! Ready to begin Phase 2 (Infrastructure Setup).
Phase 2: Infrastructure Setup
This phase focuses on preparing the hosting environment and basic infrastructure components.
2.1 AWS Account Setup
- Configure AWS CLI and credentials
- Set up Terraform backend (S3 + DynamoDB for state locking)
- Create Route 53 hosted zone for domain
- Set up budget alerts and cost monitoring
2.2 Terraform Infrastructure Foundation
- Create VPC with public/private subnets
- Set up Internet Gateway and NAT Gateway (if needed)
- Configure Security Groups (EC2, RDS, ALB rules)
- Provision EC2 instance with appropriate IAM role
- Set up RDS PostgreSQL instance
- Configure Route 53 DNS records
- Install Docker and Docker Compose on EC2 (user data script)
2.3 Security Hardening
- Configure SSH key-based authentication only
- Set up bastion host or Systems Manager Session Manager
- Enable VPC Flow Logs
- Configure CloudTrail for audit logging
- Apply least-privilege IAM policies
Goals:
- AWS infrastructure provisioned via Terraform
- EC2 instance running and accessible
- RDS PostgreSQL ready
- Domain DNS configured
- Security hardening complete
- Infrastructure can be destroyed and recreated from code
Phase 3: Automated Gitea Deployment
This phase implements the automated, reproducible Gitea installation.
3.1 Database Setup
- Automate database installation (PostgreSQL/MariaDB/MySQL)
- Create Gitea database and user
- Configure database for production use
- Secure database access
3.2 Gitea Installation
- Create automation scripts/playbooks for Gitea installation
- Configure Gitea application settings
- Set up file storage and data directories
- Configure Gitea to use database
3.3 Reverse Proxy Configuration
- Install and configure reverse proxy (nginx/Apache)
- Generate/configure SSL certificates
- Configure proxy to forward to Gitea
- Ensure Gitea UI is only accessible via proxy
- Set up HTTP to HTTPS redirect
3.4 Testing
- Test Gitea accessibility via HTTPS
- Verify direct access to Gitea is blocked
- Test Gitea functionality (create user, repo, etc.)
- Validate automation by destroying and recreating environment
Goals:
- Gitea running and accessible via HTTPS through reverse proxy
- Installation fully automated and reproducible
- Documentation of deployment process
Phase 4: Update Automation
This phase implements automated update mechanisms for Gitea and related components.
4.1 Update Strategy Design
- Define update schedule (when to check/apply updates)
- Define rollback strategy
- Plan pre-update backup automation
4.2 Update Automation Implementation
- Implement automated update mechanism
- Configure pre-update health checks
- Configure post-update validation
- Set up update notifications
- Test update process
Goals:
- Automated update system operational
- Update process tested and validated
- Rollback procedure documented
Phase 5: Backup Strategy Implementation
This phase implements comprehensive backup solutions.
5.1 Backup Concept Document
- Document backup strategy (3-2-1 rule)
- Define backup scope (database, repos, config, etc.)
- Define retention policy
- Define RTO and RPO targets
5.2 Backup Implementation
- Automate database backups
- Automate Gitea data directory backups
- Automate configuration backups
- Set up backup storage (local + remote)
- Implement backup rotation and cleanup
- Schedule automated backups
5.3 Recovery Testing
- Document restore procedures
- Test database restore
- Test full system restore
- Document recovery time
Goals:
- Automated backup system operational
- Restore procedures tested and documented
- Backup strategy document completed
Phase 6: Monitoring Implementation
This phase implements monitoring for system health and performance.
6.1 Monitoring Concept Document
- Define key metrics to monitor
- Define alerting thresholds
- Define alert channels (email, Slack, etc.)
6.2 Monitoring Setup
- Deploy monitoring solution
- Configure system metrics collection (CPU, RAM, disk, network)
- Configure Gitea-specific metrics
- Configure database metrics
- Set up monitoring dashboards
- Configure alerting rules
6.3 Testing
- Simulate failure scenarios
- Verify alerts trigger correctly
- Validate dashboard accuracy
Goals:
- Monitoring system operational with dashboards
- Alerting configured and tested
- Monitoring concept document completed
Phase 7: Logging Implementation
This phase implements centralized logging for all components.
7.1 Logging Concept Document
- Define logging architecture
- Define log retention policy
- Define log analysis requirements
7.2 Logging Setup
- Deploy centralized logging solution
- Configure Gitea application logging
- Configure reverse proxy access logs
- Configure database logs
- Configure system logs collection
- Set up log parsing and indexing
- Create log search and visualization dashboards
7.3 Testing
- Verify logs are being collected
- Test log search functionality
- Test log-based alerts (if applicable)
Goals:
- Centralized logging operational
- All components sending logs to central system
- Logging concept document completed
Phase 8: Redundancy and High Availability
This phase implements fail-safe operations and redundancy.
8.1 Redundancy Concept Document
- Document SPOF (Single Points of Failure) analysis
- Design HA architecture
- Define failover strategy
- Define acceptable downtime
8.2 Redundancy Implementation (Optional/Simplified)
- Implement database redundancy (replication/clustering) OR document approach
- Implement application redundancy (multiple Gitea instances) OR document approach
- Implement load balancing OR document approach
- Document manual failover procedures
Goals:
- Redundancy concept document completed
- PoC or detailed plan for HA implementation
- Failover procedures documented
Phase 9: Documentation and Final Testing
This phase consolidates all documentation and performs end-to-end testing.
9.1 Documentation
- Create comprehensive README
- Document architecture with diagrams
- Document all procedures (deployment, updates, backup/restore, failover)
- Create runbooks for common scenarios
- Document interview discussion points
9.2 Final Testing
- Perform end-to-end deployment test
- Test all automated processes
- Verify all documentation is accurate
- Test system under load (optional)
9.3 Repository Organization
- Store all code and docs in Gitea repository
- Ensure repository is well-organized
- Add proper README and documentation
Goals:
- Complete documentation package
- All automation tested and validated
- Ready for interview presentation
Phase 10: Interview Preparation
This phase prepares for the interview discussion.
10.1 Preparation
- Review all concept documents
- Prepare to explain technology choices
- Prepare architecture diagrams for presentation
- Prepare to demonstrate the system
- List lessons learned and trade-offs made
- Prepare improvement suggestions
Goals:
- Ready to discuss all aspects of the implementation
- Demo environment functional and accessible
- Confident in technology choices and concepts
Success Criteria
- ✅ Gitea accessible via HTTPS through reverse proxy
- ✅ Installation fully automated and reproducible
- ✅ Automated updates configured and tested
- ✅ Comprehensive concept documents for: Backup, Monitoring, Logging, Redundancy
- ✅ At least one PoC implementation (optional but recommended)
- ✅ All code and documentation in Git repository
- ✅ System accessible to interviewer over internet