- Add ADR.md documenting all technology stack decisions with rationale - Create comprehensive ROADMAP.md with 10-phase implementation plan - Add 3 architecture diagrams (AWS infrastructure, application stack, network) - Document collaboration guidelines in `.github/copilot-instructions.md` - Technology stack descisions: AWS, Terraform, Ansible, Docker Compose, PostgreSQL Phase 1 establishes foundation for automated Gitea deployment with proper decision tracking and incremental development approach.
313 lines
9.3 KiB
Markdown
313 lines
9.3 KiB
Markdown
# Roadmap
|
|
|
|
This is the implementation road map for the project. It outlines the key milestones and features in incremental steps, allowing for a structured approach to development and deployment.
|
|
|
|
## Phase 1: Conceptualization and Planning
|
|
|
|
This phase will be achieved through discussion and research and will include the following steps (no code should be implemented in this phase):
|
|
|
|
### 1.1 Requirements Analysis
|
|
- Define the scope and requirements of the project
|
|
- Identify constraints and non-functional requirements
|
|
- Determine host environment (cloud provider, VPS, or local)
|
|
|
|
### 1.2 Technology Selection ✅
|
|
**Decisions documented in [ADR.md](ADR.md)**
|
|
|
|
- **Cloud**: AWS
|
|
- **Infrastructure as Code**: Terraform
|
|
- **Configuration Management**: Ansible (kept minimal)
|
|
- **Application Deployment**: Docker + Docker Compose
|
|
- **Database**: PostgreSQL (self-hosted in Docker)
|
|
- **Reverse Proxy**: Nginx
|
|
- **SSL**: Let's Encrypt with certbot
|
|
- **Update Automation**: Watchtower
|
|
- **Monitoring**: Prometheus + Grafana (later phase)
|
|
- **Logging**: Loki + Promtail (later phase)
|
|
- **Backup**: Custom scripts + S3 (later phase)
|
|
|
|
### 1.3 Architecture Design ✅
|
|
- ✅ Overall system architecture designed
|
|
- ✅ Network topology planned (VPC, subnets, security groups)
|
|
- ✅ Three architecture diagrams created in docs/diagrams/
|
|
|
|
### 1.4 Project Structure ✅
|
|
- Directory structure planned (will create incrementally per phase)
|
|
- Documentation structure in place (`docs/diagrams/`)
|
|
- Naming conventions: lowercase, hyphens for files, descriptive names
|
|
|
|
### Goals:
|
|
- ✅ A clear full Roadmap for the project available in this file
|
|
- ✅ Technology stack documented with rationale (see ADR.md)
|
|
- ✅ Architecture diagrams created (3 diagrams in docs/diagrams/)
|
|
- ✅ Project structure planned
|
|
|
|
**Phase 1 Complete!** Ready to begin Phase 2 (Infrastructure Setup).
|
|
|
|
---
|
|
|
|
## Phase 2: Infrastructure Setup
|
|
|
|
This phase focuses on preparing the hosting environment and basic infrastructure components.
|
|
|
|
### 2.1 AWS Account Setup
|
|
- Configure AWS CLI and credentials
|
|
- Set up Terraform backend (S3 + DynamoDB for state locking)
|
|
- Create Route 53 hosted zone for domain
|
|
- Set up budget alerts and cost monitoring
|
|
|
|
### 2.2 Terraform Infrastructure Foundation
|
|
- Create VPC with public/private subnets
|
|
- Set up Internet Gateway and NAT Gateway (if needed)
|
|
- Configure Security Groups (EC2, RDS, ALB rules)
|
|
- Provision EC2 instance with appropriate IAM role
|
|
- Set up RDS PostgreSQL instance
|
|
- Configure Route 53 DNS records
|
|
- Install Docker and Docker Compose on EC2 (user data script)
|
|
|
|
### 2.3 Security Hardening
|
|
- Configure SSH key-based authentication only
|
|
- Set up bastion host or Systems Manager Session Manager
|
|
- Enable VPC Flow Logs
|
|
- Configure CloudTrail for audit logging
|
|
- Apply least-privilege IAM policies
|
|
|
|
### Goals:
|
|
- AWS infrastructure provisioned via Terraform
|
|
- EC2 instance running and accessible
|
|
- RDS PostgreSQL ready
|
|
- Domain DNS configured
|
|
- Security hardening complete
|
|
- Infrastructure can be destroyed and recreated from code
|
|
|
|
---
|
|
|
|
## Phase 3: Automated Gitea Deployment
|
|
|
|
This phase implements the automated, reproducible Gitea installation.
|
|
|
|
### 3.1 Database Setup
|
|
- Automate database installation (PostgreSQL/MariaDB/MySQL)
|
|
- Create Gitea database and user
|
|
- Configure database for production use
|
|
- Secure database access
|
|
|
|
### 3.2 Gitea Installation
|
|
- Create automation scripts/playbooks for Gitea installation
|
|
- Configure Gitea application settings
|
|
- Set up file storage and data directories
|
|
- Configure Gitea to use database
|
|
|
|
### 3.3 Reverse Proxy Configuration
|
|
- Install and configure reverse proxy (nginx/Apache)
|
|
- Generate/configure SSL certificates
|
|
- Configure proxy to forward to Gitea
|
|
- Ensure Gitea UI is only accessible via proxy
|
|
- Set up HTTP to HTTPS redirect
|
|
|
|
### 3.4 Testing
|
|
- Test Gitea accessibility via HTTPS
|
|
- Verify direct access to Gitea is blocked
|
|
- Test Gitea functionality (create user, repo, etc.)
|
|
- Validate automation by destroying and recreating environment
|
|
|
|
### Goals:
|
|
- Gitea running and accessible via HTTPS through reverse proxy
|
|
- Installation fully automated and reproducible
|
|
- Documentation of deployment process
|
|
|
|
---
|
|
|
|
## Phase 4: Update Automation
|
|
|
|
This phase implements automated update mechanisms for Gitea and related components.
|
|
|
|
### 4.1 Update Strategy Design
|
|
- Define update schedule (when to check/apply updates)
|
|
- Define rollback strategy
|
|
- Plan pre-update backup automation
|
|
|
|
### 4.2 Update Automation Implementation
|
|
- Implement automated update mechanism
|
|
- Configure pre-update health checks
|
|
- Configure post-update validation
|
|
- Set up update notifications
|
|
- Test update process
|
|
|
|
### Goals:
|
|
- Automated update system operational
|
|
- Update process tested and validated
|
|
- Rollback procedure documented
|
|
|
|
---
|
|
|
|
## Phase 5: Backup Strategy Implementation
|
|
|
|
This phase implements comprehensive backup solutions.
|
|
|
|
### 5.1 Backup Concept Document
|
|
- Document backup strategy (3-2-1 rule)
|
|
- Define backup scope (database, repos, config, etc.)
|
|
- Define retention policy
|
|
- Define RTO and RPO targets
|
|
|
|
### 5.2 Backup Implementation
|
|
- Automate database backups
|
|
- Automate Gitea data directory backups
|
|
- Automate configuration backups
|
|
- Set up backup storage (local + remote)
|
|
- Implement backup rotation and cleanup
|
|
- Schedule automated backups
|
|
|
|
### 5.3 Recovery Testing
|
|
- Document restore procedures
|
|
- Test database restore
|
|
- Test full system restore
|
|
- Document recovery time
|
|
|
|
### Goals:
|
|
- Automated backup system operational
|
|
- Restore procedures tested and documented
|
|
- Backup strategy document completed
|
|
|
|
---
|
|
|
|
## Phase 6: Monitoring Implementation
|
|
|
|
This phase implements monitoring for system health and performance.
|
|
|
|
### 6.1 Monitoring Concept Document
|
|
- Define key metrics to monitor
|
|
- Define alerting thresholds
|
|
- Define alert channels (email, Slack, etc.)
|
|
|
|
### 6.2 Monitoring Setup
|
|
- Deploy monitoring solution
|
|
- Configure system metrics collection (CPU, RAM, disk, network)
|
|
- Configure Gitea-specific metrics
|
|
- Configure database metrics
|
|
- Set up monitoring dashboards
|
|
- Configure alerting rules
|
|
|
|
### 6.3 Testing
|
|
- Simulate failure scenarios
|
|
- Verify alerts trigger correctly
|
|
- Validate dashboard accuracy
|
|
|
|
### Goals:
|
|
- Monitoring system operational with dashboards
|
|
- Alerting configured and tested
|
|
- Monitoring concept document completed
|
|
|
|
---
|
|
|
|
## Phase 7: Logging Implementation
|
|
|
|
This phase implements centralized logging for all components.
|
|
|
|
### 7.1 Logging Concept Document
|
|
- Define logging architecture
|
|
- Define log retention policy
|
|
- Define log analysis requirements
|
|
|
|
### 7.2 Logging Setup
|
|
- Deploy centralized logging solution
|
|
- Configure Gitea application logging
|
|
- Configure reverse proxy access logs
|
|
- Configure database logs
|
|
- Configure system logs collection
|
|
- Set up log parsing and indexing
|
|
- Create log search and visualization dashboards
|
|
|
|
### 7.3 Testing
|
|
- Verify logs are being collected
|
|
- Test log search functionality
|
|
- Test log-based alerts (if applicable)
|
|
|
|
### Goals:
|
|
- Centralized logging operational
|
|
- All components sending logs to central system
|
|
- Logging concept document completed
|
|
|
|
---
|
|
|
|
## Phase 8: Redundancy and High Availability
|
|
|
|
This phase implements fail-safe operations and redundancy.
|
|
|
|
### 8.1 Redundancy Concept Document
|
|
- Document SPOF (Single Points of Failure) analysis
|
|
- Design HA architecture
|
|
- Define failover strategy
|
|
- Define acceptable downtime
|
|
|
|
### 8.2 Redundancy Implementation (Optional/Simplified)
|
|
- Implement database redundancy (replication/clustering) OR document approach
|
|
- Implement application redundancy (multiple Gitea instances) OR document approach
|
|
- Implement load balancing OR document approach
|
|
- Document manual failover procedures
|
|
|
|
### Goals:
|
|
- Redundancy concept document completed
|
|
- PoC or detailed plan for HA implementation
|
|
- Failover procedures documented
|
|
|
|
---
|
|
|
|
## Phase 9: Documentation and Final Testing
|
|
|
|
This phase consolidates all documentation and performs end-to-end testing.
|
|
|
|
### 9.1 Documentation
|
|
- Create comprehensive README
|
|
- Document architecture with diagrams
|
|
- Document all procedures (deployment, updates, backup/restore, failover)
|
|
- Create runbooks for common scenarios
|
|
- Document interview discussion points
|
|
|
|
### 9.2 Final Testing
|
|
- Perform end-to-end deployment test
|
|
- Test all automated processes
|
|
- Verify all documentation is accurate
|
|
- Test system under load (optional)
|
|
|
|
### 9.3 Repository Organization
|
|
- Store all code and docs in Gitea repository
|
|
- Ensure repository is well-organized
|
|
- Add proper README and documentation
|
|
|
|
### Goals:
|
|
- Complete documentation package
|
|
- All automation tested and validated
|
|
- Ready for interview presentation
|
|
|
|
---
|
|
|
|
## Phase 10: Interview Preparation
|
|
|
|
This phase prepares for the interview discussion.
|
|
|
|
### 10.1 Preparation
|
|
- Review all concept documents
|
|
- Prepare to explain technology choices
|
|
- Prepare architecture diagrams for presentation
|
|
- Prepare to demonstrate the system
|
|
- List lessons learned and trade-offs made
|
|
- Prepare improvement suggestions
|
|
|
|
### Goals:
|
|
- Ready to discuss all aspects of the implementation
|
|
- Demo environment functional and accessible
|
|
- Confident in technology choices and concepts
|
|
|
|
---
|
|
|
|
## Success Criteria
|
|
|
|
- ✅ Gitea accessible via HTTPS through reverse proxy
|
|
- ✅ Installation fully automated and reproducible
|
|
- ✅ Automated updates configured and tested
|
|
- ✅ Comprehensive concept documents for: Backup, Monitoring, Logging, Redundancy
|
|
- ✅ At least one PoC implementation (optional but recommended)
|
|
- ✅ All code and documentation in Git repository
|
|
- ✅ System accessible to interviewer over internet |